Measuring working time on certain process
For example, when you want to measure the "time required for translation" in the translation process, you can consider a method that having "reporting (inputting)" actual working time" together with the"translation result".However, in that method, it requires to have the workers to measure the actual work time in the means such as;
- Write down the start time
- Use old-fashioned stopwatch
- Use a stopwatch software to measure working time
- Use the "Stopwatch button" displayed on the screen of entering the translation
* However, there are still advantages that it is possible to respond flexibly, such as temporarily stopping the measurement, when time to be excluded such as "coffee break" or "corresponding to interrupt work " occurs halfway.
The accuracy of the reported value
Also, "Inaccurate actual work time" may be reported as a result.For example, the "work time" would be entered a little differently from the fact, if it is a system in which some incentive affects to make the "translation time" looks shorter (or longer) in terms of personnel evaluation and ability assessment.
Alternatively, if there are workers who are proud of their outcome of the work itself and have no interest in such as "translation time", we have to assume that 'perfunctory data' will be entered.
[Translation flow]





















